800-355-1696

GET A FREE QUOTE & MOVING GUIDE IN LESS THAN 30 SECONDS

Just fill out the form to view your quote, and we'll send this useful how-to book right to your inbox!

Setting Up A U-Pack Bulkhead

Safety Measures: Protective gloves should be worn while assembling and disassembling the bulkhead. We recommend two people for setup and removal as demonstrated in the photos.

The bulkhead is intended to act as a separator and is not designed to withstand the entire weight of your belongings if the load shifts in transit.

In order to keep objects from shifting, items must be secured with ropes, bungee cords, or ratchet straps prior to installing the bulkhead.

SETUP INSTRUCTIONS

bulkhead install 1.jpg
Step 1
Lean the two panels side by side against your shipment. The black pump handles must be oriented as shown in the photo.
bulkhead install 2.jpg
Step 2
Slide the loadbars together so that they fully connect in the center. Do this for top and bottom loadbars.
bulkhead install 3.jpg
Step 3
Adjust the extension tube out past the end of the wood panel until the snap button snaps securely into the proper adjustment hole, which is typically the next-to-last or last adjustment hole. Do this for the top and bottom loadbars.
bulkhead install 4.jpg
Step 4
Stand the bulkhead upright against your shipment perpendicular to the trailer floor. Pump the black handle until pads touch both trailer walls. Then pump the black handle an additional 10-12 times to secure the bulkhead inside the trailer. Do this for the top and bottom loadbars.
bulkhead install 5.jpg
Installed and Ready for Transit

ATTENTION: Failure to leave the ramp on the door side of the bulkhead will result in additional charges.

Hydraulic Bulkhead (square bars) Removal Instructions

3801 Old Greenwood Road  |  Fort Smith, Arkansas 72903

Toll Free: 800-355-1696